16
Menaiktaraf Jabatan Sultan Haji Ahmad Shah (Daripada 2 Lorong Kepada 4 Lorong), Temerloh, Pahang.
Work Description:
Instrumentation And Monitoring Of Existing Bridge Works
Period:
1/4/2021 - 31/05/2023
17
Construction Of Jln Belfield Tunnel, Flyover, Flare Wall, Relocation Existing Utilities, Pmu Roadway, Upgrading & Improvement Of Surface Road & Assoc. Works, Mukim Bandar K.lumpur - Execution & Completion Of Ground Instrumentation Works (Inclinometer)
Work Description:
Instrumentation And Monitoring Works
Period:
1/8/2022 - 30/04/2023
18
Rapid Transit System Link (Rts Link) Antara Johor Bahru Dan Singapura
Work Description:
Instrumentation And Monitoring Works For Advance Works (P1B)
Period:
6/5/2022 - 30/04/2023
Main Contractor:
Adil Permata SDN BHD
19
Projek Pembaikan Cerun Dan Kerja-Kerja Berkaitan Berhampiran Pintu 2 Istana Negara Kuala Lumpur
Work Description:
Instrumentation And Monitoring Works
Period:
27/9/2022 - 27/03/2023
20
PROJEK RAPID TRANSIT SYSTEM LINK (RTS LINK) ANTARA JOHOR BAHRU DAN SINGAPURA
Work Description:
Instrumentation And Monitoring Works For Package 1A
Period:
11/10/2022 - 31/10/2023
21
Soil Investigation Works For Cadangan Membina Sebuah Kompleks Perniagaan Satu Tingkat Di Atas Lot Pt 52045, Persiaran Aidia, Seksyen U16 Shah Alam, Selangor Darul Ehsan
Work Description:
Soil Investigation And Instrumentation Monitoring Work
Period:
14/4/2023 - 31/12/2023
22
Agile Bukit Bintang Main Building Works -
Construction And Completion Of 3 Blocks Of Service Apartment (1567 Units) Consists Of I) Phase 1: Block B 60 Levels Ii) Phase 2: Block C - 53 Levels Ill) Phase 3: Block A- 38 Levels Di Atas Lot 497,498,499, Jalan Bukit Bintang, Lot Pt 134 (511), 512,513, Jalan Delima, Lot 503, 504, 1160, 1181, Jalan Jati Kuala Lumpur (Abb) Variation Order No. 1- Mrt Tunnel Monitoring Works
Work Description:
Instrumentation And Monitoring Works
Period:
1/9/2023 - 22/11/2023
23
Proposed Tiem2 Bump/ Probe/ At Factory Construction At Taman Perindustrian Batu Berendam, Free Trade Zone, Melaka (Dilapidation Survey/Pre-Construction Condition Survey)
Work Description:
Instrumentation And Monitoring Works
Period:
15/6/2023 - 14/7/2023
24
Instrumentation and monitoring work on No.25, Jln Saujana Indah 3, Tmn Saujana Indah, 40150 Shah Alam, Selangor
Work Description:
Instrumentation And Monitoring Works
Period:
1/9/2023 - 31/11/2023
25
Construction Of Jln Belfield Tunnel, Flyover, Flare Wall, Relocation Existing Utilities, Pmu Roadway, Upgrading & Improvement Of Surface Road & Assoc. Works, Mukim Bandar K.lumpur - Execution & Completion Of Ground
Work Description:
Instrumentation And Monitoring Works
Period:
16/10/2020 - 31/08/2023
26
Construction And Completion Of Sediment Dumping Site At Lot Pt2689 Mukim Ringlet, Cameron Highlands Pahang For Tenaga Nasional Berhad -Construction Of Cell A3, A4 And A5 (Manual Monitoring Work)
Work Description:
Instrumentation And Monitoring Works
Period:
21/6/2023 - 20/09/2023
27
Package 11 (Redundancy Ipeune) Membekal Dan Memasang Pipe Air Terawat Vtama Dari Lebuhraya Sg Besi Ke Kolam Air Sedia Ada Bukit Dengkil
Work Description:
Instrumentation And Monitoring Works
Period:
1/8/2023 - 31/08/2023
28
Noise Monitoring at 2A Jalan 2/109, off Jalan Desa Utama, Taman Desa 58100 Kuala Lumpur.
Work Description:
Monitoring Works
Period:
19/8/2024 - 28/08/2024
29
Construction And Completion Of Sediment Dumping Site At Lot Pt2689 Mukim Ringlet, Cameron Highlands Pahang For Tenaga Nasional Berhad -Construction Of Cell A3, A4 And A5
Work Description:
Instrumentation And Monitoring Works
Period:
23/3/2023 - 31/1/2025
30
Projek Membina Dan Menaik Taraf Lingkaran Pulau Indah
Work Description:
Instrumentation And Monitoring Works
Period:
5/9/2023 - 31/1/2025